Abstract

For the impact of intermittent resources’ high penetration on the economic dispatch of islanded microgrid, a new economic dispatch method is presented to minimize the overall generating cost for islanded microgrid, considering a cooperative strategy between diesel generator (hereinafter referred to as DE) and battery energy storage system (BESS). The optimum economic operation range of DE and the optimal set-point between DE and BESS are presented in the cooperative dispatch strategy, in which BESS is used fully to enable DE in a lower cost and higher efficient way. The results are analyzed under various operation conditions and also prove the validity of the proposed method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call