Abstract

Cogeneration, also known as a combined heat and power (CHP) system, produces both power and heat simultaneously. It reduces the operating costs and emissions by utilising waste heat from steam turbines and contributes to incapacitating the intermittency of renewable energy. The CHP-economic dispatch (CHP-ED) is needed to overcome the load dynamics as well as renewable intermittency. In this work, a CHP system connected with a wind power plant is considered for analysing the CHPED within a typical power system area. This study examines, the CHPED with and without a wind integrated energy network. The main objective of this work is to minimise the total operating cost, while meeting the generators’ constraints and prioritising the wind power output. The feasible operating region, valve point loading impact, and prohibited working regions of the CHP plants are taken while finding a CHPED solution with an integrated wind turbine. To find a CHPED solution, an optimisation algorithm was applied and the algorithm was based on selecting the best and worst scenarios. A typical 48-unit structure was used for validating the considered technique’s success for CHPED with/without a wind power plant. In our investigation, we found that operational costs were significantly reduced with a wind energy system. The presented methodology will be useful for the CHPED process of the decentralised CHP units for promoting further integration of the wind turbines and other distributed clean energy resources.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call