Abstract

Zeton Inc. recently completed the scale-up and detailed engineering for a Fast Pyrolysis Plant processing wood at a capacity of 25 tonne/day. An estimate of the capital costs for the plant was also completed and used as a basis for determining the production costs for the plant. The production costs were estimated for a number of sensitivity cases covering feedstock costs, product yield and energy content, wood comminution and drying costs, capital cost variation and plant capacity. This paper summarizes the results of these capital and production cost estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.