Abstract

A new method for the computation of earthwork volumes in massive hillside grading projects is developed which increases the accuracy and vastly reduces the time and cost of calculations. Computations utilize the contour method and a newly introduced rolling disk planimeter with an electronic digital readout. Contour and cross section methods of volume computation are contrasted, and the advantages and typical applications for each are analyzed. The contour method is considered superior to the cross section method for hillside grading projects. The contour method requires that finished contours be detailed on the construction drawing, thereby insuring an accurate delineation of graded slopes, and a drawing which is more easily read. Characteristics and advantages of polar and rolling disk planimeters are included. Use of the new method actually lowers construction costs since an accurate knowledge of earthwork quantities enables more precise design and most important, eliminates delays, cost over-runs, redesigns, and reconstruction caused by improperly balanced grading designs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.