Abstract

The principles of earth pressure balanced (EPB) shield tunneling techniques are reviewed, whereby the face is stabilized without using compressed-air, and ground settlement is successfully kept to a minimum level. A general description of the mechanical structure of the EPB tunneling machine is given. The shield advancement control concept, which has a great influence on the successful achievement of soft ground tunneling, is examined. Even an EPB shield machine's merits and characteristics cannot be maxmized without appropriate shield advancement control. The concepts for the application of a shield machine with a closed face and mechanical excavation system are also discussed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call