Abstract
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements to assess project performance and progress. It involves integrating the three critical elements of the project covering schedule, work scope, and cost. Various benefits are associated with the use of EVM in project management. This research aims to analyze four units of building construction projects using the EVM method consisting of an analysis of project performance, estimation of cost, and time for project completion, and planning estimation analysis against project completion. The results revealed that from the aspect of time, three buildings were completed ahead of schedule, and another one was behind schedule. In terms of cost, three buildings cost lower than the estimated budget, while one other building was higher.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.