Abstract

The early warning capability of the global model GME of the Deutscher Wetterdienst (DWD) is investigated for the case of a storm in the western Mediterranean Sea in November 2002. The Balearic Islands and the Algerian coast were hardest hit by it with record amounts of precipitation producing floods and mud avalanches, and high winds. Signals for a big storm were predicted several days in advance by the operational GME model. Also, several forecasts with higher resolution are compared using initial data interpolated from the IFS analysis of ECMWF. As the extreme precipitation was produced by orographically enhanced rain, higher rain rates and total sums were predicted with higher resolution than the operational model. However, the resolution has only small or no impact on the position and minimum pressure of the cyclone, and on the extreme surface winds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.