Abstract

Cost estimation is an important aspect of the management of software development projects. Most cost estimation models require an estimate of the size of the program to be developed. Accurate size estimation is thus critically important. This research relates the size of C and PASCAL programs to information available at successive stages in program development. The data considered are counts of subprograms and variables. Simple models using only these data are shown to be not accurate enough after specification and high-level design. After detailed design, though, they give acceptable estimates for both languages, even across a range of sizes and applications. Estimates based on a weighted variable count (where each variable is weighted by the number of subprograms in which it is referenced) are better than those based on simple variable counts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.