Abstract
Abstract To eliminate the early failures and improve the reliability, nine ex-factory machining centers are traced under field conditions in workshops. Their early failure information throughout the ex-factory run-in test is collected. The field early failure database is constructed based on the collection of field early failure data and the codification of data. Early failure mode and effects analysis is performed to indicate the weak subsystem of a machining center or the troublemaker. The distribution of the time between early failures is analyzed and the optimal ex-factory run-in test time for machining center that may expose sufficiently the early failures and cost minimum is discussed. Suggestions how to arrange ex-factory run-in test and how to take actions to reduce early failures for machining center is proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.