Abstract

This article analyses the differences in the use or applicability of the electronic procurement organisational suitability (EPOS) method between Uganda Revenue Authority (URA) and Ministry of Water and Environment (MOWE). Specifically, the paper examines the differences in organisational e-willingness, e-readiness, and the level of efficiency between URA and MOWE. To ascertain this, the researchers employed a quantitative paradigm that used descriptive and case study research designs. Means were used to measure the extent of applicability for the EPOS method and levels of efficiency among the two organisations. The independent t-test on the other hand, was devised to determine variations among the study variables. Findings revealed a high extent of using the EPOS method (average mean = 4.37) with negligible differences in its applicability (F value 12%, and sig. 0.021). However, high differences in favour of MOWE were noted in areas of e-readiness (F value = 58% and sig. 0.019) though the e-willingness dimension remained with low levels of variation (F value of 4%, and sig. 0.041) between the two organisations. In view of this, the researchers conclude and recommend a balanced approach in the implementation of any e-solution if effective results are to be realised.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call