Abstract

Failures caused by heavy duty conditions, as well as the changes of technological requirements, are basic reasons for the redesign of specific substructures of the high performance machines (HPM). This paper presents solutions of reconstruction and comparative stress analyses for original and redesigned representative HPM subsystems. The efficiency of these reconstructions is unquestionably confirmed by experimental investigations as well as failureless service of mentioned subsystems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.