Abstract

Loading containers into a vessel can be delayed because of inefficient processes in the container yard. These container yard inefficient processes can be caused by inappropriate stacking position and inefficient crane operation. Inappropriate containers stacking positions may need some preparatory jobs of rearranging containers ahead of loading time to reduce delays in the process. The method will allow preparatory jobs to be scheduled together with main jobs to optimize use of the idle time of ASCs. This research aims to find a better scheduling strategy of twin ASCs as well as improving land utilization in a vertical-layout container yard to minimize delays in containers loading process. The uncertainty of truck arrival is accomodated by implementing iterative rescheduling in look-ahead planning horizon. The algorithm finds the optimal position of the container in the yard by implementing scoring function for each available slot. Finally, some numerical experiments are conducted to prove the performance of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.