Abstract

We introduce in this paper a multi-user terminal system for a container port to reduce the cargo handling cost. Due to the complexity in that system, an efficient yard operation must be desired. Then we propose a dynamic yard operation with trailers in the terminal. By the dynamic operation, the number of trailers can be reduced by 10% while keeping the cycle time of a quay crane the same as one with a conventional operation. Further the average handling time per ship can be 2 hours less with the same number of trailers as in the conventional one.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.