Abstract

Abstract A dynamic model for underbalanced drilling has been developed in a joint industry project. The model is of use for planning an operation, and especially evaluations of dynamic pressure and flow effects. Use of the model can help prevent excessive pressure transients during operations, which will have negative effects on well productivity. Experiments have been performed in a vertical, extensively instrumented, test well. The experiments focused on dynamic operations; such as kick-off or unloading, changes in liquid and/or gas injection rates and pipe connections as well as "steady state" periods. The tests were performed with either "parasite string" gas injection, or drillstring gas injection. Simulations with the dynamic model has been performed, using experimental quantities as input (geometries, liquids, rates etc.) Results show that the model performs very well for "parasite string" gas injection. For drilling gas injection system, the model performs well for low and medium gas rates. For very high gas rates, there is still room for improvements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.