Abstract

With the rapid development of cloud computing and network technologies, large-scale remote sensing data collection tasks are receiving more interest from individuals and small and medium-sized enterprises. Large-scale remote sensing data collection has its challenges, including less available node resources, short collection time, and lower collection efficiency. Moreover, public remote data sources have restrictions on user settings, such as access to IP, frequency, and bandwidth. In order to satisfy users’ demand for accessing public remote sensing data collection nodes and effectively increase the data collection speed, this paper proposes a TSCD-TSA dynamic task scheduling algorithm that combines the BP neural network prediction algorithm with PSO-based task scheduling algorithms. Comparative experiments were carried out using the proposed task scheduling algorithms on an acquisition task using data from Sentinel2. The experimental results show that the MAX-MAX-PSO dynamic task scheduling algorithm has a smaller fitness value and a faster convergence speed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.