Abstract

PurposeThis paper aims to address the supplier selection (SS) problem under dynamic business environments to optimize the procurement cost of spare-parts in the context of a mining equipment company (MEC). Practically, involved parameters’ value does not remain constant as planning periods due to fluctuation in the demand and their market dynamics. Therefore, dynamicity in the parameter is considered as an important factor when a company forms a responsive chain through most eligible suppliers with respect to planning periods. This area of study may be considered for their complexities to the approaches toward order-allocations with bi-products of unused and repair spare-parts.Design/methodology/approachAn integrated methodology of analytic hierarchy process (AHP) and mixed-integer non-linear programming (MILP) is implemented in the two stages during each planning periods. In the first stage, AHP is used to obtain the relative weights with respect to each spare-parts of each criterion and based on that, the ranking is evaluated in accordance with case considered. And in the second stage, MILP is formulated to find the allocations of each spare-part with two distinct approaches through Model-1 and Model-2 separately. Moreover, Model-1 and Model-2 are outlined based on the ranking and efficient parameters-value under cost, limited capacities, quality level and delay lead time respectively.FindingsThe ranking and their optimal order-allocation of potential suppliers are obtained during consecutive planning periods for both unused and repair spare-parts. Subsequently, sensitivity analysis is conducted to deduce the key nuggets with the comparison of Model-1 and Model-2 in the changing of capacity, demand and cost per spare-parts. From this analysis, it is found that suppliers who have optimal parameter settings would be better for order-allocations than ranking during the changing planning period.Practical implicationsThis paper points out the situation-specific approach for SS problem for a mining industry which often faces disruptive supplying environments. The managerial implication between ranking and parameters are highlighted through Model-1 and Model-2 by sensitivity analysis.Originality/valueIt provides useful directions for managers who are involved in the procurement of spare-parts in the mining environment. For this, suppliers are selected for order-allocation by using Model-1 and Model-2 in the dynamic business environment. The solvability of the model is presented using LINGO 17. Furthermore, the case company selected in this study can be extended to other sectors.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.