Abstract

The secondary system of Qinshan phase I nuclear power plant is simulated in this study. According to the characteristics of the JTopmeret model, the system is divided into six parts for modeling, which are the deaerator, the high pressure (HP) turbine, the low pressure (LP) turbine, the moisture separator reheater (MSR), the condensate system, and the feedwater system. All parts are built as the graphic automatic models in JTopmeret and debugged on the large-scale simulation platform GSE to complete the steady-state and dynamic simulation of the models. The results show that the steady-state and dynamic processes of the models are consistent with the characteristics of the actual system. It verifies the correctness of the simulation models. Thus, this research is able to provide guidance for the operation analysis and the equipment debugging of the secondary system of the nuclear power plant.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call