Abstract

The behaviour of a decentralized polygeneration plant providing synthetic natural gas (SNG), steam and electrical power is simulated in three scenarios in this study. The plant size is based on an assumed capacity of decentralized polygeneration plants processing 1070 m3 h−1 (STP) of syngas. 396 m3 h−1 (STP) of raw SNG, 0.4 t h−1 of steam at 5 bar and 670 kW of electrical power can be generated by the plant at the reference scenario. Methanation reactor and steam generator are modelled in detail. Further results indicate that such a polygeneration plant can provide positive and negative operation reserves for the electricity network to the extent of 100% of the reference power output, while the amount of generated steam varies by less than 40%. At the same time, the generated SNG quality keeps constant. Lower variations in the amount of generated steam are applicable when reducing the operation reserve capacity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call