Abstract

Because of different refining route of every charge, it's difficult to make a static scheduling plan for steelmaking-refining-continuous casting (SRCC) production. There are many types of disturbances that upset the scheduling plan including processing time variation, temperature variation, quality variation, flow speed variation of cater, machine failures, and which could cause the static scheduling to become inefficient and even infeasible. It is necessary to adjust the schedule or generate a new executable schedule upon the occurrence of unanticipated disruptions and changes. An optimization scheduling strategy framework is proposed including static scheduling, dynamic scheduling, assistant equipment scheduling. The static scheduling plan is made by using expert systems, programming method, fuzzy evaluation. The dynamic scheduling is including the partial rescheduling and complete rescheduling by using heuristic and programming methods. The assistant equipment scheduling plan is made based on heuristic method. The dynamic intelligent scheduling system was developed with the optimization scheduling strategy, and has been applied to a large steel enterprise steelmaking-refining-continuous casting production.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.