Abstract

Track guidance vehicle (RGV) is widely used in logistics warehousing and intelligent workshop, and its scheduling effectiveness will directly affect the production and operation efficiency of enterprises. In practical operation, central information system often lacks flexibility and timeliness. By contrast, mobile computing can balance the central information system and the distributed processing system, so that useful, accurate, and timely information can be provided to RGV. In order to optimize the RGV scheduling problem in uncertain environment, a genetic algorithm scheduling rule (GAM) using greedy algorithm as the genetic screening criterion is proposed in this paper. In the experiment, RGV scheduling of two-step processing in an intelligent workshop is selected as the research object. The experimental results show that the GAM model can carry out real-time dynamic programming, and the optimization efficiency is remarkable before a certain threshold.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call