Abstract

Fluctuating customer demands, expected short delivery times and the need for quick order confirmation creates a fast-paced scheduling environment for modern production systems. In this turbulent scene, using the data provided by intelligent elements of cyber-physical production systems opens up new possibilities for dynamic scheduling. The paper introduces a reinforcement learning approach, in particular Q-Learning, to reduce the average lead-time of production orders in a job-shop production system. The intelligent product agents are able to choose a machine for every production step based on real-time information. A performance comparison against standard dispatching rules is given, which shows that in the presented dynamic scheduling use-cases the application of RL reduces the average lead-time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.