Abstract

This paper presents a scheduling algorithm applied to a circular manufacture assembly with redundant facilities. The task is to switch on and off facilities in a manner that minimizes job failure cost and job flow time for a given job production order. The dynamic nature of the scheduling problem is dictated by the aging of the facilities. An example is given to show how our scheduling algorithm results in different system reliability, failure cost and job flow time under differently weighed cost functionals.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.