Abstract
ABSTRACTThe problem of dynamic scheduling for single machine manufacturing systems has been extensively studied in the past under different setup scenarios, mainly for systems with infinite buffer capacity. This paper addresses a general framework and investigates similarities and differences between policies optimal if setup times and costs are or are not negligible, if buffers have a finite or an infinite capacity. The cost function takes into account of backlog and surplus, but also includes a demand loss component if buffers have a finite capacity and a setup cost if not negligible. Both a steady state and a transient optimization problem are considered and already known results are compared and extended to complete the analysis.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.