Abstract

This paper focuses on the container loading and unloading problem with dynamic ship arrival times. Using a determined berth plan, in combination with the reality of a container terminal production scheduling environment, this paper proposes a scheduling method for quay cranes that can be used for multiple vessels in a container terminal, based on a dynamic rolling-horizon strategy. The goal of this method is to minimize the operation time of all ships at port and obtain operation equilibrium of quay cranes by establishing a mathematical model and using a genetic algorithm to solve the model. Numerical simulations are applied to calculate the optimal loading and unloading order and the completion time of container tasks on a ship. By comparing this result with the traditional method of quay crane loading and unloading, the paper verifies that the quay crane scheduling method for multiple vessels based on a dynamic rolling-horizon strategy can provide a positive contribution to improve the efficiency of container terminal quay crane loading and unloading and reduce resource wastage.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.