Abstract

AbstractBuried pipelines in urban area are prone to corrosion defects for many years. Ensure the safety of buried corrosion pipelines is a key concern during tunnel blasting excavation. Based on the blasting engineering along Shenzhen Metro Line 12, the field test of full‐scale concrete pipeline adjacent blasting was implemented. The dynamic response of concrete pipeline induced by blasting vibration was analyzed by using the dynamic finite element numerical simulation method, and the reliability of numerical simulation was verified by the field monitoring data. On this basis, considering the corrosion defect morphology of pipeline, the distribution characteristics of peak particle velocity and peak effective stress of concrete pipeline with different corrosion depths, corrosion widths, and corrosion lengths induced by blasting vibration were discussed. The parameter analysis method was used to research the influence of corrosion morphology parameters on the dynamic response of the pipeline, and the corrosion depth of the inner‐wall of the pipeline was defined as the main control parameter of the dynamic response. According to the failure criteria of concrete materials, the safety criterion of corroded concrete pipelines with different service years subjected to blasting vibration was established.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call