Abstract

Coupled dynamic analysis of the Deep Draft Multi-Spar (DDMS) platform and the mooring system under the action of waves and current is carried out in the time domain. Using a geometrically nonlinear finite element method, the mooring-line dynamics is simulated based on the total Lagrangian formulation. Wave groups are obtained by the JONSWAP spectrum and an empirical wave envelope spectrum involving two envelope-based factors Group Height Factor (GFH) and Group Length Factor (GLF). The results show that the wave groups have a significant effect on the motion responses of the platform and the mooring line tensions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.