Abstract

In data integration systems a user request issued at a central site is decomposed into a number of sub-requests, which later on are processed at the remote sites. The results are sent back to a central site for data integration and the results of integration are returned to a user. Data integration systems often failed to show its best performance due to unpredictable data arrival rate. Traditionally, data integration requires the complete results from the remote sites to be available at a central site before final computations begin. An online integration system starts and continues the computations at the central site shortly after every piece of data is received from the remote sites. Execution of online integration plan in static scheduling strategy causes poor performance of data integration system as unnecessary computations are executed in some circumstances. This paper proposes a dynamic scheduling for online integration plans, which employs data increment monitoring system which is able to dynamically change the data integration plans whenever it is necessary.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.