Abstract

The thermal stress on thick-walled components, such as tubesheets and steam drums, limits both the temperature ramp-up rates and the temperature differences between outer and inner walls. The cyclic operation of concentrating solar power plants may lead to fatigue damage. For these reasons, a stress analysis of the steam generator is required to assure its lifetime.A methodology is presented for the thermo-mechanical analysis of the steam generator for a parabolic trough power plant. This methodology consists of coupling transient thermodynamic and stress models of the heat exchangers in order to calculate the stress. Besides the heat exchanger models, a transient model for a TEMA H heat exchanger is proposed. Finite element simulations are carried out to calculate the deviations of the simplified analytical models. In this way, a powerful tool that allows the analysis and optimization of the steam generator operation is proposed.The results suggest that U-tube tubesheets are exposed to high thermal stresses on the no-tube-lane zone, especially in the reheater. The steam generator start-up can be accomplished in around 45 min using 36.4 MWhth. Furthermore, the TEMA X evaporator presents a thermal stress reduction of 35% compared to the kettle evaporator.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.