Abstract
This paper seeks to determine a dynamic Pareto-optimal method for a single machine scheduling based on two criteria simultaneously: setup expenditure criterion and average orders utility criterion. Series-batch and parallel-batch problems with sequence-dependent setup times are considered. In this method the concept of production intensity as dynamic production process parameter is used. A set of applied software allows scheduling for middle quantity of jobs. The result of software application is the set of non-dominant versions proposed to a user for making a final choice.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Industrial and Systems Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.