Abstract

Due to overprovisioning of infrastructure nodes in overlay networks, many nodes remain idle at times of low network load. Some of these nodes could be temporary removed from the overlay topology and could then be used for other purposes or alternatively be temporarily shut down, to save energy.In this paper we present several algorithms to select the subset of overlay nodes that should be part of the overlay topology. This decision is made based on the current and (estimated) future network load and the locality of the clients and servers connected to the overlay network. As network load or conditions change, additional nodes can be dynamically (de)activated. Our algorithms can be used in conjunction with existing overlay topology construction protocols.Through extensive simulations, we have evaluated and compared the performance of our algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.