Abstract
Determination of the optimal operational policy for an automotive supply chain is explored under a centralized management approach using dynamic programming. A deterministic optimal control model is proposed to meet multi-product demand over a period while minimizing a cost performance index for a five-echelon network. The production-inventory levels are the state variables and the raw material acquisition rates are the control variables to be decided in the problem. The novelties include parts mixing operations, assembly requirements, and a push–pull chain operation strategy. The continuous model is solved using Iterative Dynamic Programming, an algorithm with successful applications in chemical engineering problems. Its implementation here is the first in supply chain (SC) management models. The results demonstrate that the proposal is suitable to represent the dynamic behavior of the SC and provides useful information to outline a cooperative decision-making process. Managerial insights are derived to improve the resilience and efficiency of the chain.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.