Abstract

The current baseline concept for a European DEMO defines a pulsed reactor producing power for periods of 2–4h at a time, interrupted by dwell periods of approximately half an hour, potentially leading to cyclic fatigue of the heat transfer system and power generation equipment. Thermal energy storage systems could mitigate pulsing issues; however, the requirements for such a system cannot be defined without first understanding the challenges for pulsed operation, while any system will simultaneously increase the cost and complexity of the balance of plant.This work therefore presents a dynamic model of the primary heat transfer system and associated steam plant for a water-cooled DEMO, without energy storage, capable of simulating pulsed plant operation. An operating regime is defined such that the primary coolant flows continuously throughout the dwell period while the secondary steam flow is reduced. Simulation results show minimised thermal and pressure transients in the primary circuit, and small thermally induced stresses on the steam turbine rotor. If the turbine can be kept spinning to also minimise mechanical cycling, pulsed operation of a water-cooled DEMO without thermal energy storage may be feasible.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call