Abstract

PurposeThe aim of this paper is to develop a model based on system dynamics (SD) approach, which integrates three subsystems for simulating construction and demolition (C&D) waste management in Shenzhen, Mainland China.Design/methodology/approachSD approach was first used to construct the model for C&D waste management in Shenzhen. The model was then converted for running on computer through the software package “iThink”, which was specifically designed for SD modeling. The data required for model simulation was derived through various ways, including literature review, examination of official reports and yearbooks, and questionnaires. After all the parameters in the model were determined, simulation was carried out.FindingsThe model proposed in this research can provide an experimental simulation platform to investigate the complexity and interdependencies of factors in managing C&D waste in Shenzhen, Mainland China. The simulation results show that the pressing situation of C&D waste management in Shenzhen would aggravate if no effective measures were taken to address it during the simulation period. Participants' active participation and cost consideration are the two major factors affecting C&D waste reduction. Furthermore, new landfills should be planned to properly handle the C&D waste accumulated in Shenzhen over the past few years.Originality/valueAlthough some studies have been conducted under the topic of C&D waste management during the past few years in Shenzhen – how to effectively and efficiently handle the waste is still unsolved. Factors affecting the effectiveness of C&D waste management have separately been examined in the previous studies, without considering their interrelations. The SD‐based model is developed in this research to investigate the complex and interdependent relationships among these factors. The model can deepen participants' understandings about C&D waste management and help explore the major factors affecting the effectiveness of management activities. The measures, which are proposed based on the simulation results, can serve as a valuable reference for planning C&D waste management in Shenzhen.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.