Abstract

Due to the intermittent nature of dynamic line rating (DLR) of overhead lines, DLR forecasting plays an important role in the scheduling of power networks. In the DLR forecasting, the trend and fluctuation of past data are modeled and future DLR values are estimated. Autoregressive model and its variants are expanded to reach accurate forecasting. Such methods apply white noise assumption to account for the DLR fluctuations. Since DLR fluctuations are related to weather condition, the white noise assumption cannot model fluctuations correctly. The Brownian motion has been implemented to meet data fluctuation issues in time series prediction. The Ornstein–Uhlenbeck (OU) process is one of the most widely used group of forecasting methods which consider Brownian motion. However, this approach is able to model a single factor that has never driven over the time. Therefore, implementing this factor is not suitable for forecasting DLR. In this paper, the OU process is extended into an integrated factorized OU to model and predict DLR values by considering hidden factors of DLR such as the weather conditions. The results, which are evaluated by the reference models, illustrate significant improvement in performance of the points and fluctuations of DLR.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.