Abstract

STP “De Groote Lucht” in the Netherlands had to be upgraded in order to meet the tightened criterion for total nitrogen (10 mg/l N as yearly average). ASTRASAND moving bed biofiltration, has been introduced for post-denitrification. Pilot plant tests were executed in 1996 and it was found that in order to achieve good filter performance with the specific process conditions, an adequate process control system was required. This filter control ensured removal efficiencies of >95% with influent concentrations up to 30 mg/l NO3−N and strongly fluctuating influent flows. The full scale denitrification installation with a capacity of 3,600 m3/h, the first full scale installation of this type used for biological denitrification in Europe, was built in 1998 and started up in 1999. Since the start up, the filter performance is good and the nitrate removal efficiencies are higher than required.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.