Abstract
The structure of cable-stayed bridge with inclined and arched tower is complex and the force is complicated, especially the pylon, whose design and construction require detailed calculation and analysis. In case of the construction of Datong Nansanhuan Yuhe bridge project, in order to ensure the safety during its construction, the detailed construction plan was planned and the finite element model was established to analyse the dynamic performance of structure during construction of pylon. The result shows that, during the construction of low pylon, each frequency order of bridge structure is reduced to a steady level with the pylon completed gradually, and the low frequency changes moderately.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.