Abstract

In fact, most of the construction of road pavement layers is damaged due to rainwater puddles. This study was intended to determine the durability of the Coarse Stone Matrix Asphalt mixture using gypsum waste as a filler substitution. The results of research, through the marshall immersion test with the proportion of gypsum waste as a cement filler substitution, namely 25%: 75% with 6% asphalt content and variations in immersion time, namely 12 hours, 24 hours. 36 hours, 48 hours, and 60 hours. The test results for the Coarse Asphalt Stone Matrix mixture obtained durability between 97.99% - 92.31%. The relative durability value decreases with increasing immersion time, due to a large number of cavities or pores of the mixture filled with water so that the mixture is easily damaged.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.