Abstract

The Nhlabane Estuary, located on the north-east coast of South Africa, is situated in a titanium dune mining lease area. During 1993, a mining dredger and concentrator crossed the middle reaches of the estuary. For this purpose, two berm walls were constructed across the estuary. Two impacts stemmed from the crossing. A series of fine sediment intrusions into the estuary from the berm wall area occurred during late 1993 and early 1994 and caused a rapid decline in benthic densities and number of taxa. Recovery of the affected area was slow and characterized by initial proliferation of opportunistic colonizers. The berm walls, which divided the estuary in half, were kept in place for nearly three years and caused changes in water quality and the benthic community of the upper and lower halves of the estuary. Artificial breaching of the estuary in August 1995 and removal of the berm walls in May 1996 initiated recovery of the estuary. The success of a second dredger crossing, scheduled for January 1999, depends on addressing the mistakes made during the first crossing and on the speed with which the carefully planned crossing operation, berm wall removal and estuary rehabilitation proceed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.