Abstract

ABSTRACT Oversize rock fragments are highly undesired in a sublevel caving (SLC) operation as they affect the production cycle, equipment, and infrastructure. In this study, a field test was carried out in Malmberget mine to analyse the impact of oversize fragments on the production cycle and the costs of different procedures for handling such fragments. The tests involved monitoring of dumping oversize fragments in two orepasses, one with a grizzly and the other one without a grizzly, using cameras. The cycle times of load-haul-dump (LHD) machines were determined for both orepasses. The results indicate that the grizzly increased the availability and productivity of the orepass despite increasing the cycle time of the LHD machines. Moreover, installation of a boulder breaker system along with the grizzly can further increase the productivity and the cost of such a system will be paid off in a shorter time in terms of enhanced productivity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.