Abstract

In this study, a biomass based power generation system is proposed. This system includes a BIG (BIG) system to produce syngas, a proton exchange membrane (PEM) type fuel cell (FC), a gas turbine (GT), and an organic Rankine cycle (ORC). In order to evaluate the system function, first a parametric study is conducted and the effect of the design variables on the production power, exergy efficiency, and the total cost rate (TCR) of the system is investigated. Design variables include biomass moisture content, gasification temperature, compressor pressure ratio, air heat exchanger temperature difference, pressure of FC, current density of FC, LP Stage PPTD, and HP stage pressure. It is observed that the determining factors in the TCR of the system are more affected by the cost of the gasifier and PEM FC system. It is also observed that the ORC plays a greater role in recovering wasted heat and generating power compared to GT. Finally, it is observed that in optimal operating conditions, the exergy efficiency of the system are 33.19% and TCR is 693 $/h, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.