Abstract

The relationship between linear programming dual estimates for the optimal production plan model and real regional market costs is studied. A two-stage linear programming model is necessary for exact approximation of cost allocation in analyzing with optimal plan estimates. A sign criterion is formulated for analyzing the reliability of the production planning model based on a comparison of the changes in the regional market costs and optimal plan estimates. An example is given to illustrate the analysis of reliability of the solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.