Abstract
Battery energy storage systems (BESSs) need to comply with grid code and fault ride through (FRT) requirements during disturbances whether they are in charging or discharging mode. Previous literature has shown that constant charging current control of BESSs in charging mode can prevent BESSs from complying with emerging grid codes such as the German grid code under stringent unbalanced fault conditions. To address this challenge, this paper proposes a new FRT-activated dual control strategy that consists of switching from constant battery current control to constant DC-link voltage control through a positive droop structure. The results show that the strategy ensures proper DC-link voltage and current management as well as adequate control of the positive- and negative-sequence active and reactive currents according to the grid code priority. It is also shown that the proposed FRT control strategy is tolerant to initial operating conditions of BESS plant, grid code requirements, and fault severity.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.