Abstract

A new concept of power plant heat-sink system is presented which employs the combination of a conventional wet-tower and a conventional dry-tower. The purpose of this cooling system is to reduce wet cooling-tower makeup-water requirements in water-short areas. The dry tower operates all year around while the wet-peaking tower is used only above certain ambient dry-bulb temperatures. The two cooling circuits serve separate sections of a conventional, surface-type, steam condenser. Thermal performance analysis is presented for various combinations of cooling systems ranging from 100 percent wet to 100 percent dry. Annual makeup-water requirements are calculated for various sizes of towers located in 18 selected cities of the U.S.A. ranging from north to south and east to west.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.