Abstract

Summary Esso Resources Canada Ltd. drilled its second horizontal well at Cold Lake, this time achieving a 1016-m [3,333-ft] horizontal interval. Two key limitations—hole drag and wellbore position accuracy—required special attention. The well design and the methods planned to accommodate these limitations are compared with the actual well data.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call