Abstract

ABSTRACT This paper discusses drilling a 2,000-foot horizontal well in the Devonian Shale, Wayne County, West Virginia, to test the concept that multiple hydraulic fractures from a horizontal wellbore can increase gas recovery efficiency over vertical stimulated boreholes. Discussion focuses on the air/mist drilling, wireline probes, and bottomhole assemblies that were used to drill the well. The target was a 50-foot zone located at a depth of 3,400 feet. Total hole length was 6,020 feet. The angle-building section was achieved using a 4.25°/100-foot design to reduce the risks associated with casing installation in the horizontal section. Directional control methods proved to be unreliable in an air-drilling environment. Bottomhole assembly performance was heavily dependent on motor life and lithologic type. The completion program for the well consisted of installation of 4 1/2-inch casing with external casing packers and port collars. This completion string was installed in 2,000 feet of open hole section that was air drilled. Both geophysical well logs and a borehole television camera survey were used to design the casing string so that shale intervals could be isolated for testing and evaluation before and after stimulation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call