Abstract

In order to solve subgrade problems during the road construction in the shallow ground water area, light well point drainage technology is used, combined with the zhengbian logistics road. This paper expounds application principle of the light well point drainage, calculation and construction methods. When using light well point drainage, the appropriate permeability coefficient is 4 m/d relatively. If using water rushed law construction, water pressure should be controlled in 0.3-0.7 MPa. After well point equipment operates for 3-5 days, the foundation will form the precipitation funnel; then, soil can be excavated after drainaging 7-8d. It is shown that the light well point drainaging can reduce underground water lefficiently.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.