Abstract

Abstract The use of open-hole completions in the design of production wells is a particularly appealing choice for oil companies, since it can ensure huge economic advantage compared to conventional cased-hole completions. Nowadays, most operators are looking for more innovative economical well completion design. Swell packer is one of the technology that widely used in open-hole completion strategy with combination of others completion accessories. Coupling the swell packer with open-hole completion application, it makes multiple zonal pressure isolation in the following open-hole completion possible: bare foot condition, predrilled liner, stand-alone screen, open-hole gravel pack or even open-hole fracturing packing. However, few typical implications associated with open-hole completion which complicated further the well integrity and flow performance monitoring. In 2012, 11 oil producer wells were completed in Field X with open-hole completion and installed with stand-alone screen (SAS), swell packers and double valve float shoes. First oil was achieved in April 2012 with all wells initially producing high oil rate and low water cut. However, towards the end of 2013, some of the wells started to show high water production. Production logging (PL) was conducted at Well #1 to evaluate the flow contribution and water source. It was concluded that the water was coming from the bottom of double valve float shoe. Remedial action was taken by setting a plug for water shut-off and the water rate dropped drastically. In 2015, it was decided to replicate the production/well diagnostic analysis in all open-hole completed wells. Similar results were then observed by production log (PL) and consequently, remedial action was taken accordingly. The production log (PL) interpretation, historical production plot and surface well test results were integrated and provide the required information to determine the forward production strategy in these open-hole completed wells. This paper will share multiple case studies where water source diagnostics have been performed in open-hole completions, as well as lessons learnt and best practices throughout this process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.