Abstract
Summary This paper describes some of the work performed in Phase 1 of a multiphase joint industry program to investigate a down-hole maintenance system for subsea completions that is both reliable and cost-effective. Phase 1 covered concept selection, leaving Phases 2 and 3 to cover critical component design and further development, respectively. The approach taken in Phase 1 to accomplish the program's purpose was to identify and then to study those concepts for transporting maintenance tool strings through the water column and into the subsea tree that eliminated the requirement of a drill vessel for surface support.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.