Abstract
The focusing performance of a double magnetic lens and the delay in the arrival time at the shot point are presented for a Pb-coated superconducting inertial fusion energy target injection system. Magnets placed symmetrically in the injection path adjust the target trajectory and focus it toward the designated point. When the target passes through the magnetic lens, it receives deceleration and acceleration forces, producing a delay in the arrival time. c © 2009 The Japan Society of Plasma Science and Nuclear Fusion Research
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.