Abstract
To reduce the impact of the model mismatch on the conversion efficiency of wave energy converters (WECs), a double-layer model predictive control (DMPC) method is proposed. Two closely related control layers are included in the DMPC method: (1) The first control layer is compensation control, which deals with the model mismatch by using the prediction data from the second layer. (2) The second layer aims to maximize energy output while taking the compensation value from the first layer into consideration. The sum of the compensation value obtained at the first layer and the control value obtained at the second layer refers to the final control input for the real system. The simulation results demonstrate that the proposed method effectively reduces the impact of the model mismatch and complies with control input and float’s position limitations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.